Domain 1: Installation

Question 1

An 8-inch flexible supply branch delivers much less air than scheduled. Its damper is fully open, its connections are airtight, and the other branches deliver their scheduled airflow. In the attic, 25 feet of flex has been bunched into a 14-foot route with a tight loop. The approved layout specifies an 8-inch branch along that route. What should be corrected before another balancing attempt?

Show answer & explanation

Correct answer: C - Shorten and fully extend the flex, using broad bends and nonconstricting supports.

Question 2

A shop drawing specifies a metal duct with inside dimensions of 20 by 14 inches before lining. The installed duct has 1-inch liner on all four walls. A valid equal-area traverse gives an average velocity of 600 feet per minute across the remaining clear opening. The acceptable airflow for this section is 810-990 CFM. Which airflow and disposition belong on the start-up sheet?

Show answer & explanation

Correct answer: D - About 900 CFM; within the acceptable range.

Question 3

With both pressure ports open to the same room, an electronic manometer reads +0.12 in. w.c. The technician then connects it to the supply and return test ports and obtains a higher-than-expected pressure reading. No equipment adjustment has been made. How should the technician handle this result?

Show answer & explanation

Correct answer: B - Check the meter setup and zero, then repeat the pressure measurement.

Question 4

While fabricating rectangular duct, a sheet-metal worker forms one longitudinal edge into a pocket. The mating edge receives a right-angle flange, which is inserted into that pocket before the exposed locking edge is hammered closed. This connection is a:

Show answer & explanation

Correct answer: C - Pittsburgh lock seam

Domain 2: Service

Question 5

At blower start and stop, a broad rectangular return-duct panel snaps inward or outward with one loud pop. It is quiet at steady fan speed. Supports and joints are secure, the blower wheel turns smoothly, and measured static pressure is within the equipment's operating range. Which repair most directly targets the noise?

Show answer & explanation

Correct answer: D - Stiffen the flexing panel with reinforcement appropriate to the duct construction.

Domain 3: System Components

Question 6

During furnace start-up, the temperature rise reaches 74°F; the nameplate permits 35-65°F. Gas input is correct, the filter and coil are clean, the ducts are unobstructed, and blower rotation is correct. The cooling airflow setting is appropriate, but the heating setting is the lowest approved tap. The high limit opens late in each heating cycle. Which adjustment addresses this evidence?

Show answer & explanation

Correct answer: A - Select a higher approved heating-blower setting and recheck the temperature rise.

Question 7

During start-up after return-duct replacement, a home's carbon monoxide alarm sounds. The homeowner reports a headache, and another occupant feels dizzy. The furnace is operating in the basement. What takes priority over further equipment testing?

Show answer & explanation

Correct answer: A - Get everyone outdoors and call emergency services from outside.

Question 8

A constant-airflow ECM blower is programmed for 1,200 CFM. After a more restrictive filter is installed, measured airflow remains near 1,200 CFM, but blower speed and electrical power increase. The motor remains within its approved operating envelope. What does this behavior indicate?

Show answer & explanation

Correct answer: A - The blower is compensating for added resistance to maintain its programmed airflow.

Domain 4: Applied Knowledge

Question 9

Water accumulates in a new draw-through air handler's drain pan only while the blower runs. When the blower stops, the pan empties promptly. The drain is clear, slopes correctly, and terminates freely. Its trap is primed, but the effective water seal is shallower than the unit requires. An installer proposes a vent tee between the pan and the trap. What should be done instead?

Show answer & explanation

Correct answer: B - Rebuild the trap to the required seal depth and verify drainage with the blower running.

Question 10

A vertical wall penetration requires a fire damper that can close while the supply fan continues operating. Closure conditions can reach 2,500 feet per minute and 1.5 in. w.c. All four candidates have the required fire-resistance rating and size. Which listing satisfies the installation conditions?

Show answer & explanation

Correct answer: D - Dynamic-rated; closure limits of 3,000 FPM and 4.0 in. w.c.; listed for vertical walls.

That's 10 of 1,030

The full bank has 1,020 more NATE-AIR-DIST-INSTALL questions with explanations.

Continue in the free practice test →

View plans